Author Image
Hello

Er. Banwari Lal

Civil Engineer And Home Designer

  • Age 27
  • Address Gorakhpur UP India
  • E-mail contact@erbanwarilal.com
  • Phone +91870XXXXX88
  • Experiences From 2015 to Till (7 Year)
  • Currently Tata Projects Ltd
  • Previously NCC LTD
  • Previous RR TRADERS

Currently Working in Tata projects Ltd, Composite Gravity Dam Projects , Heavy structure Construction, irrigation pipe line, BPT (Break pressure Tank), Construction Execution, Etc.. And in previous company NCC Limited - water supply projects , WTP, ESR , Pipe Line , Over Head Tank , Rising Main , Distribution pipe line ,HDPE , DI, GI, House Connection, Water Sector, Water Treatment Plant, Irrigation, Water Supply, BBS , Structure of Clear Water Reservior( CWR) , Cascade Airator, CLF , Filter House , Staff Room , Admin Block ,Etc.

My Experience

  • TATA Projects Ltd

  • 2022

    Gravity Dam Activity

    Layout Marking, Level check, excavation, foundation, Spillway, Radial Gate, Up stream training wall , Down Stream Training wall, Gallery, Sump Well, instruments, stilling basin, Consolidation Grouting, Curtain Grouting, Percolation test, Logue on Vallue, Measurement, execution and quality control, Etc.

  • 2022

    Irrigation Activity

    BPT ( Break Pressure Tank) Pump House, MS pipe Gunniting,MS pipe Laying, DI pipe Laying , HDPE Pipe Laying, Hydrotest etc.

  • 2022

    Key Skill

    Innovative, Risk Management, Cost Control, Progress, local issues Management, team lead, DPR, Planning, execution, quality control etc..

  • NCC LTD

  • 2021

    WTP (Water Treatment Plants)

    Intake Well, Casecade airator, CLF, F Mixer, Filter Bed, Filter House, Chlorination House, CWR, Pump House, etc..

  • 2021

    Distribution Network

    OHT (Over Head Tank) CWR ( Clear Water Reservoir), ESR ( Elevated Storage Reservoir) , DI pipe line , GI pipe line , HDPE pipe line , Jointing and laying , Hydrotest, commissioning, etc.. .

  • RR TRADERS

  • 2020

    Ramnagar Karjaha Water Supply Scheme, Pipraich, Gkp

    Turn Key Basis (OHT, Pump House, Rising Main, Tube well, Pipe Distribution System, Staff Quarter and Boundary Wall related works)

  • 2019

    Kalani Buzurg Water Supply Scheme, Piprauli, GkP

    Turn Key Basis OHT, Pump House, Rising Main, Tube well, Pipe Distribution System, Staff Quarter and Boundary Wall related works ( 63mm, 75mm, 90mm, 110mm , 140mm, 160mm, 180mm, 200mm HDPE, And DI 250, 300, 350 mm) Hydrotest Commissioning etc.

  • 2018

    Pali Khas Water Supply Scheme, Pali, Gkp

    Turn Key Basis OHT, Pump House, Rising Main, Tube well, Pipe Distribution System, Staff Quarter and Boundary Wall related works ( 63mm, 75mm, 90mm, 110mm , 140mm, 160mm, 180mm, 200mm HDPE, And DI 250, 300, 350 mm) Hydrotest Commissioning etc.

  • 2018

    Prajapatipur Water Supply Scheme (World Bank), Sant Kabir Nagar

    Turn Key Basis OHT, Pump House, Rising Main, Tube well, Pipe Distribution System, Staff Quarter and Boundary Wall related works ( 63mm, 75mm, 90mm, 110mm , 140mm, 160mm, 180mm, 200mm HDPE, And DI 250, 300, 350 mm) Hydrotest Commissioning etc.

  • 2018

    Molhnapur Water Supply Scheme(World Bank), Sant Kabir Nagar

    Turn Key Basis OHT, Pump House, Rising Main, Tube well, Pipe Distribution System, Staff Quarter and Boundary Wall related works ( 63mm, 75mm, 90mm, 110mm , 140mm, 160mm, 180mm, 200mm HDPE, And DI 250, 300, 350 mm) Hydrotest Commissioning etc.

  • 2015 - 2017

    Bangai Gov. Water Supply Scheme Chargawan, Gkp

    Turn Key Basis OHT, Pump House, Rising Main, Tube well, Pipe Distribution System, Staff Quarter and Boundary Wall related works ( 63mm, 75mm, 90mm, 110mm , 140mm, 160mm, 180mm, 200mm HDPE, And DI 250, 300, 350 mm) Hydrotest Commissioning etc.

  • 2016-2017

    Karmaha Buzurg Water Supply Scheme (World Bank) Gkp

    Turn Key Basis OHT, Pump House, Rising Main, Tube well, Pipe Distribution System, Staff Quarter and Boundary Wall related works ( 63mm, 75mm, 90mm, 110mm , 140mm, 160mm, 180mm, 200mm HDPE, And DI 250, 300, 350 mm) Hydrotest Commissioning etc.

  • 2015 - 2017

    Mahmoodabad GP Water Supply Scheme Pipraich, Gkp

    Turn Key Basis OHT, Pump House, Rising Main, Tube well, Pipe Distribution System, Staff Quarter and Boundary Wall related works ( 63mm, 75mm, 90mm, 110mm , 140mm, 160mm, 180mm, 200mm HDPE, And DI 250, 300, 350 mm) Hydrotest Commissioning etc.

My Interest

First of all I love music, country music is my favorite. Love watching movies and playing games with my buddies. I spend quite a lot of time in traveling and photography, these keeps me fresh for working environment. I also spend time researching some knowledge.

  • Music
  • Movies
  • Photo
  • Chess
  • Traveling
  • Knowledge

From the Blog

Showing posts with label CHARACTERISTICS OF GOOD BUILDING STONES. Show all posts
Showing posts with label CHARACTERISTICS OF GOOD BUILDING STONES. Show all posts
CHARACTERISTICS OF GOOD BUILDING STONES