Currently Working in Tata projects Ltd, Composite Gravity Dam Projects , Heavy structure Construction, irrigation pipe line, BPT (Break pressure Tank), Construction Execution, Etc.. And in previous company NCC Limited - water supply projects , WTP, ESR , Pipe Line , Over Head Tank , Rising Main , Distribution pipe line ,HDPE , DI, GI, House Connection, Water Sector, Water Treatment Plant, Irrigation, Water Supply, BBS , Structure of Clear Water Reservior( CWR) , Cascade Airator, CLF , Filter House , Staff Room , Admin Block ,Etc.

My Experience

  • TATA Projects Ltd

  • 2022

    Gravity Dam Activity

    Layout Marking, Level check, excavation, foundation, Spillway, Radial Gate, Up stream training wall , Down Stream Training wall, Gallery, Sump Well, instruments, stilling basin, Consolidation Grouting, Curtain Grouting, Percolation test, Logue on Vallue, Measurement, execution and quality control, Etc.

  • 2022

    Irrigation Activity

    BPT ( Break Pressure Tank) Pump House, MS pipe Gunniting,MS pipe Laying, DI pipe Laying , HDPE Pipe Laying, Hydrotest etc.

  • 2022

    Key Skill

    Innovative, Risk Management, Cost Control, Progress, local issues Management, team lead, DPR, Planning, execution, quality control etc..

  • NCC LTD

  • 2021

    WTP (Water Treatment Plants)

    Intake Well, Casecade airator, CLF, F Mixer, Filter Bed, Filter House, Chlorination House, CWR, Pump House, etc..

  • 2021

    Distribution Network

    OHT (Over Head Tank) CWR ( Clear Water Reservoir), ESR ( Elevated Storage Reservoir) , DI pipe line , GI pipe line , HDPE pipe line , Jointing and laying , Hydrotest, commissioning, etc.. .

  • RR TRADERS

  • 2020

    Ramnagar Karjaha Water Supply Scheme, Pipraich, Gkp

    Turn Key Basis (OHT, Pump House, Rising Main, Tube well, Pipe Distribution System, Staff Quarter and Boundary Wall related works)

  • 2019

    Kalani Buzurg Water Supply Scheme, Piprauli, GkP

    Turn Key Basis OHT, Pump House, Rising Main, Tube well, Pipe Distribution System, Staff Quarter and Boundary Wall related works ( 63mm, 75mm, 90mm, 110mm , 140mm, 160mm, 180mm, 200mm HDPE, And DI 250, 300, 350 mm) Hydrotest Commissioning etc.

  • 2018

    Pali Khas Water Supply Scheme, Pali, Gkp

    Turn Key Basis OHT, Pump House, Rising Main, Tube well, Pipe Distribution System, Staff Quarter and Boundary Wall related works ( 63mm, 75mm, 90mm, 110mm , 140mm, 160mm, 180mm, 200mm HDPE, And DI 250, 300, 350 mm) Hydrotest Commissioning etc.

  • 2018

    Prajapatipur Water Supply Scheme (World Bank), Sant Kabir Nagar

    Turn Key Basis OHT, Pump House, Rising Main, Tube well, Pipe Distribution System, Staff Quarter and Boundary Wall related works ( 63mm, 75mm, 90mm, 110mm , 140mm, 160mm, 180mm, 200mm HDPE, And DI 250, 300, 350 mm) Hydrotest Commissioning etc.

  • 2018

    Molhnapur Water Supply Scheme(World Bank), Sant Kabir Nagar

    Turn Key Basis OHT, Pump House, Rising Main, Tube well, Pipe Distribution System, Staff Quarter and Boundary Wall related works ( 63mm, 75mm, 90mm, 110mm , 140mm, 160mm, 180mm, 200mm HDPE, And DI 250, 300, 350 mm) Hydrotest Commissioning etc.

  • 2015 - 2017

    Bangai Gov. Water Supply Scheme Chargawan, Gkp

    Turn Key Basis OHT, Pump House, Rising Main, Tube well, Pipe Distribution System, Staff Quarter and Boundary Wall related works ( 63mm, 75mm, 90mm, 110mm , 140mm, 160mm, 180mm, 200mm HDPE, And DI 250, 300, 350 mm) Hydrotest Commissioning etc.

  • 2016-2017

    Karmaha Buzurg Water Supply Scheme (World Bank) Gkp

    Turn Key Basis OHT, Pump House, Rising Main, Tube well, Pipe Distribution System, Staff Quarter and Boundary Wall related works ( 63mm, 75mm, 90mm, 110mm , 140mm, 160mm, 180mm, 200mm HDPE, And DI 250, 300, 350 mm) Hydrotest Commissioning etc.

  • 2015 - 2017

    Mahmoodabad GP Water Supply Scheme Pipraich, Gkp

    Turn Key Basis OHT, Pump House, Rising Main, Tube well, Pipe Distribution System, Staff Quarter and Boundary Wall related works ( 63mm, 75mm, 90mm, 110mm , 140mm, 160mm, 180mm, 200mm HDPE, And DI 250, 300, 350 mm) Hydrotest Commissioning etc.

My Interest

First of all I love music, country music is my favorite. Love watching movies and playing games with my buddies. I spend quite a lot of time in traveling and photography, these keeps me fresh for working environment. I also spend time researching some knowledge.

  • Music
  • Movies
  • Photo
  • Chess
  • Traveling
  • Knowledge

From the Blog

HDPE Pipe Laying Methodology
Construction materials - Timber
Tests on stones , Field test and laboratory test
CHARACTERISTICS OF GOOD BUILDING STONES
HDPE Pipe Laying process